top of page

HONEYBEE ROBOTICS

Honeybee Robotics needed a new 45,000 SF office and lab space facility for the Longmont team. We worked closely with their team to design an ISO 7 clean room, a machine shop, vibe table room, and flexible lab space for their various fabrication and testing processes. All electrical power, HVAC, Nitrogen, and air supply needs were coordinated with a team of engineers. At the front of house we designed multiple offices, open work areas, a break room, and multiple conference rooms. The Tenant Improvement part of the project was completed in Spring of 2020.

In addition, a new entry façade was designed around the bones of the existing entryway for Honeybee Robotics. Stripping the 70’s era veneer, we re-clad the existing pillars, soffit, landscape retaining walls, and mansard roof with modern materials. Recessed silo multiple lights were integrated into the soffit to give the entry a subtle robotic look. This part of the project is slated for construction in fall of 2020.

Honeybee Robotics -Perspective 01.jpg
Honeybee Robotics -Perspective 02.jpg
Honeybee Robotics -Perspective 04.jpg
Honeybee Robotics -Perspective 04.jpg
Honeybee Robotics Entry - A6.1 Details.j
Honeybee Robotics -Perspective 05.jpg
Honeybee Robotics - A1.1 Floor Plan.jpg

Project Credits:

Produced While at Hampton Architecture 

MEP Engineer: MDP Engieering Group

Structural Engineer: Baur & Associates

Contractor: Findlay/ Criss

Clean Room Vendor: Clean Zone Technology